Year1986 | On May 20th 1986, China Ship Research and Development Academy and Zhongyuan Oilfield Company signed a contract to jointly develop a cable logging system project called “520” project. Lu Jianxun, who was the president of the Academy, served as the chief engineer of the project. |
Year1991 | In 1991, Huali Petroleum Equipment Development Center was officially established. |
Year1994 | In 1994, Lu Jianxun, the chief engineer of 520 project, was elected as one of the founding academicians of the Chinese Academy of Engineering. |
Year1996 | In 1996, the project “520” logging system passed the technical appraisal presided over by the State Science and Technology Commission. |
Year1997 | In 1997, the project “520” logging system was designated as one of the National Key Emerging Product. |
Year1999 | In 1999, Huali Petroleum Equipment Development Center relocated to Changping and renamed Huanding Energy Services. |
Year2001 | In 2001, Huanding Energy Services completed the development of the project “521” logging system. |
Year2002 | In 2002, Huanding Energy Services has entered into a strategic cooperation with Halliburton Energy Services. Huanding Energy Services was authorized to serve as the OEM manufactureser for Halliburton’s MRIL-P (Magnetic Resonance Imaging Logging Prime), D4TG tools, EXCELL2000 surface systems. Huanding Energy Services was granted the right to solely distribute these products within the domestic market. |
Year2003 | In 2003, Huanding Energy Services completed the development of the project ”530” logging system and “HH-2530” surface system, and the project won the National Torch Program Award |
Year2010 | In 2010, Huanding Energy Services completed the development of the project ”580” wireline imaging logging system. |
Year2012 | In 2012, Huanding Energy Services completed the project “wireline memory dual mode” logging system and the project “Tractor”. In the same year, construction began on the Gu’an production base, spanning a total area of 97 acres. |
Year2020 | In 2020, Huanding Energy Services completed the project “sidewall coring”, “pipe cutter” and “pipe driller”. |
Year2025 | In 2025, Huanding Energy Services launched High-Energy Metal Jet Pipe Cutter (MJC) and Huanding Free Point Indicator Tool (HFPI). |
Future... |
We keep walking…
Now HT slim hole logging system and wireless measurement while drilling are on developing… |